Production Worker Helpers, Second Shift
Employer
930 Hensley Lane
Wylie, TX 75098
United States
Job description
Assist in the production of aluminum products. Lift/load/measure metal to be cut. Unload and stack cut metal products. Load/unload/prepare metal to be painted. Lifting, counting, load and unload hanging painted metal. Clean work areas/equipment. This is manual work and does not include machine or equipment operation. Does not directly include painting. Entry level; requires supervision.
Special Requirements
Must lift/carry 75 lbs., when necessary. Saturday and Sunday work required, when necessary. Second shift may be offered: 6:00 PM - 6:00 AM. Maximum shifts are 12 hours per day,6pm-6am. The actual work schedule for each day of the week is subject to change. Not every employee will work 12 hour shifts, 7 days a week. An employee may work up to 12 hours per day, but may work alternating days or may work a portion of a 12 hour shift. We will offer at least 40 hours in a typical workweek, hours in excess of 40 will vary depending on staff, production quotas and other factors to be evaluated on a daily basis. Employer-paid drug testing required of foreign and domestic workers prior to commencing work and post-hire at random, upon suspicion of use, and post-accident. Post-hire background check required of foreign and domestic workers.