Farmworkers And Laborers
Employer
Packing House 8865 US Hwy. 441
Boynton Beach, FL 33472
United States
Job description
Lay Plastic (Drip): Workers are required to load 75 to 80 lbs. rolls of plastic and drip tape rolls weighing approximately 50lbs on to machinery and ride on the back of machinery to ensure rolls are distributed evenly on beds of dirt. Worker is required to ride fertilizer wagon and use a shovel to make sure there is no clogging of fertilizer at distribution. The worker is required to remove casing when rolls of plastic and drip tape have emptied and repeat process. Plastic machine riders have other tasks required to lay plastic such as: bed pressing, clean out fertilizer hoppers, painting numbers and measuring row lengths. Workers are required to use a shovel to tuck in the ends of the plastic being laid by machinery at the ends of each row. Repairs are to be made to plastic and splices as necessary throughout field. Worker is to cut plastic at each hundred foot marked area to create a walkway by slicing with shovel and tuck plastic after removing excess dirt to create walkways for harvest. Worker is required to dig a spillway at each row designated; by the removal of dirt and forming a plastic barrier with rolls of plastic to create a spillage for water to drain. Units covered will be divided by number of workers on the crew times the pay rate. Shoveling also includes across row to allow drainage to occur. Clean up of drip and plastic scraps, paper and wood. Worker is required to remove casing when rolls of plastic and drip tape have emptied and repeat process. Plastic machine riders have other tasks required to lay plastic such as: bed pressing, clean out fertilizer hoppers, painting numbers and measuring row lengths. Pile and burn or load on wagon for disposal.
Lay Plastic (Seep): Workers are required to load 75 to 80 lbs. rolls of plastic and drip tape rolls weighing approximately 50lbs on to machinery and ride on the back of machinery to ensure rolls are distributed evenly on beds of dirt. Worker is required to ride fertilizer wagon and use a shovel to make sure there is no clogging of fertilizer at distribution. The worker is required to remove casing when rolls of plastic and drip tape have emptied and repeat process. Plastic machine riders have other tasks required to lay plastic such as: bed pressing, clean out fertilizer hoppers, painting numbers and measuring row lengths. Workers are required to use a shovel to tuck in the ends of the plastic being laid by machinery at the ends of each row. Repairs are to be made to plastic and splices as necessary throughout field. Worker is to cut plastic at each hundred foot marked area to create a walkway by slicing with shovel and tuck plastic after removing excess dirt to create walkways for harvest. Worker is required to dig a spillway at each row designated; by the removal of dirt and forming a plastic barrier with rolls of plastic to create a spillage for water to drain. Units covered will be divided by number of workers on the crew times the pay rate.
V DITCHES -End & Row Cutting: Worker is to cut plastic at each hundred foot marked area to create a walkway by slicing with shovel and tuck plastic after removing excess dirt to create walkways for harvest. Worker is required to dig a spillway at each row designated; by the removal of dirt and forming a plastic barrier with rolls of plastic to create a spillage for water to drain. Units covered will be divided by number of workers on the crew times the pay rate.
Special Requirements
The employer may perform criminal background checks post-employment and at the employers expense.